Work continues, despite the heat! We’ve had a minor obstacle to overcome this week. An issue was discovered with one…Continue readingHall Build – Week 29
Category: New Village Hall
New Village Hall
Hall Build – Week 28
Work continues on the walls… At the end of this week, we’ve got the east and west wings of the…Continue readingHall Build – Week 28
Hall Build – Week 27
We’ve got walls! Ok, not all the walls just yet, but the first solid sides to the main hall are…Continue readingHall Build – Week 27
Hall Build – Week 26
Concrete week! The Big Concrete Pour went ahead as scheduled on Wednesday this week. A slightly dodgy weather forecast turned…Continue readingHall Build – Week 26
Hall Build – Week 25
There’s been a few delays recently around sequencing the connection of the borehole pipework into the outbuilding and laying the…Continue readingHall Build – Week 25
Hall Build – Week 23
Lots of sand this week! A large stack of white and orange ton bags are gradually being diminished and the…Continue readingHall Build – Week 23
Hall Build – Week 22
It’s been a week of heavy digging by hand and by machine for the guys at TRF. The end result…Continue readingHall Build – Week 22
Hall Build – Week 21
The day(s) of the big drill finally arrived! From first thing on Monday, GreenHeat Renewables were on site in force…Continue readingHall Build – Week 21
Hall Build – Week 20
The blocks keep coming… (check out the intricate cuts, joining blocks to steel by TRF!) but this week, we have…Continue readingHall Build – Week 20
Hall Build – Week 19
More blockwork and pipes this week… Three courses of blocks are now all but complete around the main outer wall,…Continue readingHall Build – Week 19